A simulated annealing approach for the train design optimization problem (Q1992782): Difference between revisions
From MaRDI portal
Set OpenAlex properties. |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: Nominal and robust train timetabling problems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: An application of genetic and tabu searches to the freight railroad operating plan problem / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A Survey of Optimization Models for Train Routing and Scheduling / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Applications of operations research and management science. Case studies / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Optimization by Simulated Annealing / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A simulated annealing approach to the railroad freight transportation design problem / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3785827 / rank | |||
Normal rank |
Latest revision as of 05:31, 17 July 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A simulated annealing approach for the train design optimization problem |
scientific article |
Statements
A simulated annealing approach for the train design optimization problem (English)
0 references
5 November 2018
0 references
Summary: The Train Design Optimization Problem regards making optimal decisions on the number and movement of locomotives and crews through a railway network, so as to satisfy requested pick-up and delivery of car blocks at stations. In a mathematical programming formulation, the objective function to minimize is composed of the costs associated with the movement of locomotives and cars, the loading/unloading operations, the number of locomotives, and the crews' return to their departure stations. The constraints include upper bounds for number of car blocks per locomotive, number of car block swaps, and number of locomotives passing through railroad segments. We propose here a heuristic method to solve this highly combinatorial problem in two steps. The first one finds an initial, feasible solution by means of an ad hoc algorithm. The second step uses the simulated annealing concept to improve the initial solution, followed by a procedure aiming to further reduce the number of needed locomotives. We show that our results are competitive with those found in the literature.
0 references
0 references