Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis (Q1736812): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: PSPLIB -- a project scheduling problem library / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of variants and extensions of the resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Experimental investigation of heuristics for resource-constrained project scheduling: an update / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simulation and evaluation of earned value metrics to forecast the project duration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q2712748 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Common singular spectrum analysis of several time series / rank
 
Normal rank
Property / cites work
 
Property / cites work: Forecasting UK Industrial Production with Multivariate Singular Spectrum Analysis / rank
 
Normal rank
Property / cites work
 
Property / cites work: Separability and window length in singular spectrum analysis / rank
 
Normal rank

Latest revision as of 22:52, 18 July 2024

scientific article
Language Label Description Also known as
English
Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis
scientific article

    Statements

    Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis (English)
    0 references
    0 references
    26 March 2019
    0 references
    Summary: During a construction project life cycle, project costs and time estimations contribute greatly to baseline scheduling. Besides, schedule risk analysis and project control are also influenced by the above factors. Although many papers have offered estimation techniques, little attempt has been made to generate project time series data as daily progressive estimations in different project environments that could help researchers in generating general and customized formulae in further studies. This paper, however, is an attempt to introduce a new simulation approach to reflect the data regarding time series progress of the project, considering the specifications and the complexity of the project and the environment where the project is performed. Moreover, this simulator can equip project managers with estimated information, which reassures them of the execution stages of the project although they lack historical data. A case study is presented to show the usefulness of the model and its applicability in practice. In this study, singular spectrum analysis has been employed to analyze the simulated outputs, and the results are separated based on their signal and noise trends. The signal trend is used as a point-of-reference to compare the outputs of a simulation employing S-curve technique results and the formulae corresponding to earned value management, as well as the life of a given project.
    0 references
    project management
    0 references
    project progress simulation
    0 references
    singular spectrum analysis
    0 references
    S-curve technique
    0 references
    earned value management
    0 references

    Identifiers