A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem (Q1869904): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Set OpenAlex properties.
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/s0305-0548(01)00098-3 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2059573430 / rank
 
Normal rank

Latest revision as of 10:31, 30 July 2024

scientific article
Language Label Description Also known as
English
A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
scientific article

    Statements

    A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem (English)
    0 references
    0 references
    0 references
    0 references
    28 April 2003
    0 references
    Scheduling
    0 references
    two-stage assembly flowshop
    0 references
    branch and bound algorithm
    0 references
    total weighted flowtime scheduling
    0 references

    Identifiers