On linear lower bounds for the resource constrained project scheduling problem. (Q1399576): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Set OpenAlex properties.
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/s0377-2217(02)00763-4 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2031216051 / rank
 
Normal rank

Latest revision as of 10:34, 30 July 2024

scientific article
Language Label Description Also known as
English
On linear lower bounds for the resource constrained project scheduling problem.
scientific article

    Statements

    On linear lower bounds for the resource constrained project scheduling problem. (English)
    0 references
    30 July 2003
    0 references
    In the paper lower bounds for the resource-constrained project scheduling problem minimizing the makespan are proposed. These bounds depend linearly on the processing times of the activities. After showing that several bounds from the literature belong to this class of bounds, two new approaches are presented. The first is based on a general linear programming scheme, the second uses the concept of redundant resources. Computational results are presented for the PSPLIB benchmark instances of \textit{R. Kolisch, A. Sprecher} and \textit{A. Drexl} [Manage. Sci. 41, 1693--1703 (1995; Zbl 0870.90070)] showing the effectiveness of the proposed procedures.
    0 references
    0 references
    resource-constrained project scheduling
    0 references
    lower bounds
    0 references
    linear programming
    0 references
    redundant resources