Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups (Q5059220): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Group technology in a hybrid flowshop environment: a case study / rank
 
Normal rank
Property / cites work
 
Property / cites work: A discrete inter-species cuckoo search for flowshop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Group scheduling with deteriorating jobs and allotted resource under limited resource availability constraint / rank
 
Normal rank

Revision as of 04:49, 31 July 2024

scientific article; zbMATH DE number 7637057
Language Label Description Also known as
English
Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups
scientific article; zbMATH DE number 7637057

    Statements

    Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    23 December 2022
    0 references
    flexible flowshop
    0 references
    genetic algorithms
    0 references
    group scheduling
    0 references
    multiple setups
    0 references
    preventive maintenance
    0 references

    Identifiers