Minimizing the total completion time in a distributed two stage assembly system with setup times (Q337027): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Normalize DOI.
Property / DOI
 
Property / DOI: 10.1016/j.cor.2014.02.005 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.COR.2014.02.005 / rank
 
Normal rank

Revision as of 00:05, 9 December 2024

scientific article
Language Label Description Also known as
English
Minimizing the total completion time in a distributed two stage assembly system with setup times
scientific article

    Statements

    Minimizing the total completion time in a distributed two stage assembly system with setup times (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    10 November 2016
    0 references
    scheduling
    0 references
    distributed two-stage assembly flowshop
    0 references
    hybrid meta-heuristics
    0 references
    total completion time
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers