Minimizing total late work on a single machine with generalized due-dates (Q2030324): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2020.12.061 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2020.12.061 / rank
 
Normal rank

Latest revision as of 20:04, 16 December 2024

scientific article
Language Label Description Also known as
English
Minimizing total late work on a single machine with generalized due-dates
scientific article

    Statements

    Minimizing total late work on a single machine with generalized due-dates (English)
    0 references
    0 references
    0 references
    0 references
    7 June 2021
    0 references
    scheduling
    0 references
    single machine
    0 references
    total late work
    0 references
    generalized due-dates
    0 references
    job rejection
    0 references
    unavailability period
    0 references
    0 references
    0 references

    Identifiers