Minimizing total late work on a single machine with generalized due-dates
From MaRDI portal
Publication:2030324
DOI10.1016/j.ejor.2020.12.061zbMath1487.90309MaRDI QIDQ2030324
Dvir Shabtay, Gur Mosheiov, Daniel Oron
Publication date: 7 June 2021
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2020.12.061
scheduling; single machine; job rejection; total late work; generalized due-dates; unavailability period
90B35: Deterministic scheduling theory in operations research
90C39: Dynamic programming
68M20: Performance evaluation, queueing, and scheduling in the context of computer systems
Related Items
Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work, A no-delay single machine scheduling problem to minimize total weighted early and late work, Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work, Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity, A new perspective on single-machine scheduling problems with late work related criteria, Single machine scheduling with assignable due dates to minimize maximum and total late work, Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works, A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems, Pareto-scheduling of two competing agents with their own equal processing times, A survey of job shop scheduling problem: the types and models, Single machine scheduling with rejection and generalized parameters, Minimizing total weighted late work on a single-machine with non-availability intervals, Single machine scheduling with common assignable due date/due window to minimize total weighted early and late work
Cites Work
- Unnamed Item
- Unnamed Item
- A single machine scheduling problem to minimize total early work
- A survey on offline scheduling with rejection
- Scheduling with time-changing effects and rate-modifying activities
- Dominance relations for two-machine flow shop problem with late work criterion
- Single-machine scheduling under the job rejection constraint
- On the complexity of generalized due date scheduling problems
- Minimizing maximum absolute lateness and range of lateness under generalized due dates on a single machine
- A note on the SPT heuristic for solving scheduling problems with generalized due dates
- Single machine scheduling with assignable due dates
- Approximation algorithms for precedence-constrained identical machine scheduling with rejection
- Minimizing total load on a proportionate flowshop with position-dependent processing times and job-rejection
- A note: minimizing total absolute deviation of job completion times on unrelated machines with general position-dependent processing times and job-rejection
- The two-machine flow-shop problem with weighted late work criterion and common due date
- On the parameterized tractability of single machine scheduling with rejection
- Rescheduling under disruptions in manufacturing systems. Models and algorithms
- Two-agent single-machine scheduling with assignable due dates
- Regular scheduling measures on proportionate flowshop with job rejection
- Comments on ``Proportionate flowshops with general position dependent processing times and ``Minimizing total load on a proportionate flowshop with position-dependent processing times and job-rejection
- Machine scheduling with an availability constraint
- An improved heuristic for parallel machine scheduling with rejection
- Minimizing Total Tardiness on One Machine is NP-Hard
- THE NP-HARDNESS OF MINIMIZING THE TOTAL LATE WORK ON AN UNBOUNDED BATCH MACHINE
- Single Machine Scheduling to Minimize Total Late Work
- Single-machine batch scheduling problem with job rejection and resource dependent processing times
- Approximation schemes for single‐machine scheduling with a fixed maintenance activity to minimize the total amount of late work
- Single Machine Scheduling to Minimize Total Weighted Late Work
- Two-machine flow-shop scheduling to minimize total late work: revisited
- Single‐machine scheduling with deadlines to minimize the total weighted late work
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- A new class of scheduling criteria and their optimization