Minimizing the total completion time in a distributed two stage assembly system with setup times (Q337027): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Importer (talk | contribs)
Changed an Item
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B35 / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90C59 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 6650667 / rank
 
Normal rank
Property / zbMATH Keywords
 
scheduling
Property / zbMATH Keywords: scheduling / rank
 
Normal rank
Property / zbMATH Keywords
 
distributed two-stage assembly flowshop
Property / zbMATH Keywords: distributed two-stage assembly flowshop / rank
 
Normal rank
Property / zbMATH Keywords
 
hybrid meta-heuristics
Property / zbMATH Keywords: hybrid meta-heuristics / rank
 
Normal rank
Property / zbMATH Keywords
 
total completion time
Property / zbMATH Keywords: total completion time / rank
 
Normal rank

Revision as of 05:21, 28 June 2023

scientific article
Language Label Description Also known as
English
Minimizing the total completion time in a distributed two stage assembly system with setup times
scientific article

    Statements

    Minimizing the total completion time in a distributed two stage assembly system with setup times (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    10 November 2016
    0 references
    scheduling
    0 references
    distributed two-stage assembly flowshop
    0 references
    hybrid meta-heuristics
    0 references
    total completion time
    0 references

    Identifiers