An integrated cost model for production scheduling and perfect maintenance (Q553937): Difference between revisions
From MaRDI portal
Created a new Item |
Changed an Item |
||
Property / review text | |||
Summary: Production scheduling deals with scheduling production jobs on a machine (single or multiple) in order to optimise a specific objective such as total weighted completion times or total weighted tardiness. The assumption that machines are always available for processing jobs is generally used in the production scheduling literature. In reality, machines often are unavailable due to preventive maintenance activities or machine failure. Production scheduling and preventive maintenance planning are interrelated, but are most often treated separately. This interdependency seems to be overlooked in the literature. This work integrates, simultaneously, the decisions of preventive maintenance and job order sequencing for a single machine. The objective is to find the job order sequence and maintenance decisions that would minimise the expected cost. | |||
Property / review text: Summary: Production scheduling deals with scheduling production jobs on a machine (single or multiple) in order to optimise a specific objective such as total weighted completion times or total weighted tardiness. The assumption that machines are always available for processing jobs is generally used in the production scheduling literature. In reality, machines often are unavailable due to preventive maintenance activities or machine failure. Production scheduling and preventive maintenance planning are interrelated, but are most often treated separately. This interdependency seems to be overlooked in the literature. This work integrates, simultaneously, the decisions of preventive maintenance and job order sequencing for a single machine. The objective is to find the job order sequence and maintenance decisions that would minimise the expected cost. / rank | |||
Normal rank | |||
Property / Mathematics Subject Classification ID | |||
Property / Mathematics Subject Classification ID: 90B35 / rank | |||
Normal rank | |||
Property / Mathematics Subject Classification ID | |||
Property / Mathematics Subject Classification ID: 90B25 / rank | |||
Normal rank | |||
Property / zbMATH DE Number | |||
Property / zbMATH DE Number: 5933713 / rank | |||
Normal rank | |||
Property / zbMATH Keywords | |||
production scheduling | |||
Property / zbMATH Keywords: production scheduling / rank | |||
Normal rank | |||
Property / zbMATH Keywords | |||
preventive maintenance | |||
Property / zbMATH Keywords: preventive maintenance / rank | |||
Normal rank | |||
Property / zbMATH Keywords | |||
deteriorating production processes | |||
Property / zbMATH Keywords: deteriorating production processes / rank | |||
Normal rank | |||
Property / zbMATH Keywords | |||
integrated models | |||
Property / zbMATH Keywords: integrated models / rank | |||
Normal rank | |||
Property / zbMATH Keywords | |||
unreliable machine | |||
Property / zbMATH Keywords: unreliable machine / rank | |||
Normal rank | |||
Property / zbMATH Keywords | |||
cost models | |||
Property / zbMATH Keywords: cost models / rank | |||
Normal rank | |||
Property / zbMATH Keywords | |||
job sequencing | |||
Property / zbMATH Keywords: job sequencing / rank | |||
Normal rank |
Revision as of 13:16, 1 July 2023
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | An integrated cost model for production scheduling and perfect maintenance |
scientific article |
Statements
An integrated cost model for production scheduling and perfect maintenance (English)
0 references
28 July 2011
0 references
Summary: Production scheduling deals with scheduling production jobs on a machine (single or multiple) in order to optimise a specific objective such as total weighted completion times or total weighted tardiness. The assumption that machines are always available for processing jobs is generally used in the production scheduling literature. In reality, machines often are unavailable due to preventive maintenance activities or machine failure. Production scheduling and preventive maintenance planning are interrelated, but are most often treated separately. This interdependency seems to be overlooked in the literature. This work integrates, simultaneously, the decisions of preventive maintenance and job order sequencing for a single machine. The objective is to find the job order sequence and maintenance decisions that would minimise the expected cost.
0 references
production scheduling
0 references
preventive maintenance
0 references
deteriorating production processes
0 references
integrated models
0 references
unreliable machine
0 references
cost models
0 references
job sequencing
0 references