A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden (Q579120): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Importer (talk | contribs)
Changed an Item
Property / review text
 
The concept of job earliness as a measure of inventory costs for single machine scheduling is introduced. The justification of earliness as a cost is presented. It is pointed out that the Japanese have long recognized earliness as a cost. The additon of earliness greatly complicated finding an optimum solution, since reducing earliness may require the insertion of machine idle time. Another measure commonly used to represent inventory cost is flowtime. In this paper, a combination of earliness and flowtime is used to represent total inventory costs. Some preliminary results are presented illustrating the complexity of solving this problem.
Property / review text: The concept of job earliness as a measure of inventory costs for single machine scheduling is introduced. The justification of earliness as a cost is presented. It is pointed out that the Japanese have long recognized earliness as a cost. The additon of earliness greatly complicated finding an optimum solution, since reducing earliness may require the insertion of machine idle time. Another measure commonly used to represent inventory cost is flowtime. In this paper, a combination of earliness and flowtime is used to represent total inventory costs. Some preliminary results are presented illustrating the complexity of solving this problem. / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B35 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 4014425 / rank
 
Normal rank
Property / zbMATH Keywords
 
job earliness
Property / zbMATH Keywords: job earliness / rank
 
Normal rank
Property / zbMATH Keywords
 
measure of inventory costs
Property / zbMATH Keywords: measure of inventory costs / rank
 
Normal rank
Property / zbMATH Keywords
 
single machine scheduling
Property / zbMATH Keywords: single machine scheduling / rank
 
Normal rank
Property / zbMATH Keywords
 
flowtime
Property / zbMATH Keywords: flowtime / rank
 
Normal rank

Revision as of 17:21, 1 July 2023

scientific article
Language Label Description Also known as
English
A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden
scientific article

    Statements

    A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden (English)
    0 references
    0 references
    0 references
    1987
    0 references
    The concept of job earliness as a measure of inventory costs for single machine scheduling is introduced. The justification of earliness as a cost is presented. It is pointed out that the Japanese have long recognized earliness as a cost. The additon of earliness greatly complicated finding an optimum solution, since reducing earliness may require the insertion of machine idle time. Another measure commonly used to represent inventory cost is flowtime. In this paper, a combination of earliness and flowtime is used to represent total inventory costs. Some preliminary results are presented illustrating the complexity of solving this problem.
    0 references
    job earliness
    0 references
    measure of inventory costs
    0 references
    single machine scheduling
    0 references
    flowtime
    0 references

    Identifiers