Pages that link to "Item:Q1772834"
From MaRDI portal
The following pages link to Project scheduling under uncertainty: survey and research potentials (Q1772834):
Displaying 50 items.
- Computing latest starting times of activities in interval-valued networks with minimal time lags (Q1044116) (← links)
- Flexible solutions in disjunctive scheduling: general formulation and study of the flow-shop case (Q1046704) (← links)
- Robust minmax regret combinatorial optimization problems with a resource-dependent uncertainty polyhedron of scenarios (Q1634058) (← links)
- Computing project makespan distributions: Markovian PERT networks revisited (Q1634063) (← links)
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem (Q1636886) (← links)
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem (Q1654362) (← links)
- Coevolutionary makespan optimisation through different ranking methods for the fuzzy flexible job shop (Q1677019) (← links)
- A mixed-method optimisation and simulation framework for supporting logistical decisions during offshore wind farm installations (Q1681411) (← links)
- Operating room surgery scheduling with fuzzy surgery durations using a metaheuristic approach (Q1738980) (← links)
- Resource cost aware scheduling (Q1750475) (← links)
- A Benders decomposition approach for solving the offshore wind farm installation planning at the North Sea (Q1751693) (← links)
- An effective heuristic for project scheduling with resource availability cost (Q1752859) (← links)
- An efficient bicriteria algorithm for stable robotic flow shop scheduling (Q1753515) (← links)
- A biobjective approach to recoverable robustness based on location planning (Q1753588) (← links)
- The impact of design uncertainty in engineer-to-order project planning (Q1753659) (← links)
- On the optimality conditions of the two-machine flow shop problem (Q1754105) (← links)
- Managing projects with uncertain deadlines (Q1755261) (← links)
- Two branch-and-bound algorithms for the robust parallel machine scheduling problem (Q1762154) (← links)
- On the fallacy of averages in project risk management (Q1772835) (← links)
- Maximization of solution flexibility for robust shop scheduling (Q1772837) (← links)
- Multi-resource allocation in stochastic project scheduling (Q1931636) (← links)
- A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations (Q1955186) (← links)
- Planning horizons based proactive rescheduling for stochastic resource-constrained project scheduling problems (Q1991259) (← links)
- Stochastic task networks -- trading performance for stability (Q2011606) (← links)
- Sharing delay costs in stochastic scheduling problems with delays (Q2026709) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- Underground mine scheduling under uncertainty (Q2031110) (← links)
- Due-date quotation model for manufacturing system scheduling under uncertainty (Q2058567) (← links)
- Computing the execution probability of jobs with replication in mixed-criticality schedules (Q2069250) (← links)
- Stochastic radiotherapy appointment scheduling (Q2103931) (← links)
- A multi-objective optimization approach for exploring the cost and makespan trade-off in additive manufacturing (Q2140160) (← links)
- Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty (Q2147061) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- Multi-objective evolutionary algorithm for solving energy-aware fuzzy job shop problems (Q2156606) (← links)
- Dominance-based linear formulation for the anchor-robust project scheduling problem (Q2239841) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- An approximate dynamic programming approach to project scheduling with uncertain resource availabilities (Q2247268) (← links)
- Skill-based framework for optimal software project selection and resource allocation (Q2256202) (← links)
- A theoretic and practical framework for scheduling in a stochastic environment (Q2268505) (← links)
- A survey of dynamic scheduling in manufacturing systems (Q2268515) (← links)
- The proactive and reactive resource-constrained project scheduling problem (Q2281615) (← links)
- Proactive and reactive strategies for football league timetabling (Q2282571) (← links)
- Robust min-max regret scheduling to minimize the weighted number of late jobs with interval processing times (Q2288971) (← links)
- Rescheduling due to machine disruption to minimize the total weighted completion time (Q2317133) (← links)
- Estimating the probability of meeting a deadline in schedules and plans (Q2321333) (← links)
- The robust crew pairing problem: model and solution methodology (Q2350073) (← links)
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints (Q2356119) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- A MIP formulation for the minmax regret total completion time in scheduling with unrelated parallel machines (Q2448222) (← links)
- A stochastic multimode model for time-cost tradeoffs under management flexibility (Q2460073) (← links)