A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations (Q1955186)

From MaRDI portal
scientific article
Language Label Description Also known as
English
A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations
scientific article

    Statements

    A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    11 June 2013
    0 references
    Summary: We study resource-constrained project scheduling problems with perturbation on activity durations. With the consideration of robustness and stability of a schedule, we model the problem as a multiobjective optimization problem. Three objectives-makespan minimization, robustness maximization, and stability maximization-are simultaneously considered. We propose a hybrid multiobjective evolutionary algorithm (H-MOEA) to solve this problem. In the process of the H-MOEA, the heuristic information is extracted periodically from the obtained nondominated solutions, and a local search procedure based on the accumulated information is incorporated. The results obtained from the computational study show that the proposed approach is feasible and effective for the resource-constrained project scheduling problems with stochastic durations.
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references