Pages that link to "Item:Q1806880"
From MaRDI portal
The following pages link to Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880):
Displayed 50 items.
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (Q1590044) (← links)
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055) (← links)
- Resource-constrained flowshop scheduling with separate resource recycling operations (Q1762095) (← links)
- An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs (Q1762128) (← links)
- Generating two-terminal directed acyclic graphs with a given complexity index by constraint logic programming (Q1764795) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- A hybrid framework for over-constrained generalized resource-constrained project scheduling problems (Q1768898) (← links)
- Justification and RCPSP: a technique that pays (Q1772841) (← links)
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects (Q1841162) (← links)
- PERT scheduling with convex cost functions. (Q1853737) (← links)
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags (Q1869389) (← links)
- Genetic algorithm solution for a risk-based partner selection problem in a virtual enterprise (Q1869897) (← links)
- A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling (Q1885984) (← links)
- Optimizing the supply chain configuration for make-to-order manufacturing (Q1926828) (← links)
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP (Q1954712) (← links)
- A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations (Q1955186) (← links)
- Effective neighbourhood functions for the flexible job shop problem (Q1976516) (← links)
- Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm (Q2268503) (← links)
- A classification of assembly line balancing problems (Q2371356) (← links)
- The resource-constrained modulo scheduling problem: an experimental study (Q2377171) (← links)
- Managing and modelling general resource transfers in (multi-)project scheduling (Q2379662) (← links)
- Scheduling and staffing multiple projects with a multi-skilled workforce (Q2379671) (← links)
- A Boolean satisfiability approach to the resource-constrained project scheduling problem (Q2430594) (← links)
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q2432851) (← links)
- A hybrid metaheuristic for the resource-constrained project scheduling problem (Q2433434) (← links)
- A hybrid genetic algorithm for the resource-constrained project scheduling problem (Q2455614) (← links)
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times (Q2467268) (← links)
- Discrete-continuous project scheduling with discounted cash flows - a tabu search approach (Q2468474) (← links)
- Hypernetworks in a directed hypergraph (Q2470103) (← links)
- A market-based multi-agent system model for decentralized multi-project scheduling (Q2480205) (← links)
- A master surgical scheduling approach for cyclic scheduling in operating room departments (Q2481565) (← links)
- Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem (Q2482379) (← links)
- Pre-emption in resource-constrained project scheduling (Q2482791) (← links)
- An evolutionary approach to rehabilitation patient scheduling: A case study (Q2482797) (← links)
- Dynamic transport scheduling under multiple resource constraints (Q2485330) (← links)
- A branch-and-cut algorithm for scheduling of projects with variable-intensity activities (Q2487846) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- Bicriteria train scheduling for high-speed passenger railroad planning applications (Q2566708) (← links)
- Scatter search for project scheduling with resource availability cost (Q2570160) (← links)
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling (Q2570161) (← links)
- Integrated planning in supply chains with buy-side and sell-side marketplaces (Q2571448) (← links)
- The Bi-Criterial Approach to Project Cost and Schedule Buffers Sizing (Q3112560) (← links)
- Optimising the Slab Yard Planning and Crane Scheduling Problem using a two-stage heuristic (Q3163219) (← links)
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows (Q3163363) (← links)
- EFFICIENT GRID SCHEDULING THROUGH THE INCREMENTAL SCHEDULE-BASED APPROACH (Q3224874) (← links)
- A new<i>any-order</i>schedule generation scheme for resource-constrained project scheduling (Q3398590) (← links)
- Research on resources optimisation deployment model and algorithm for collaborative manufacturing process (Q3527945) (← links)
- New representation to reduce the search space for the resource-constrained project scheduling problem (Q3539808) (← links)
- Polyhedral Reformulation of a Scheduling Problem And Related Theoretical Results (Q3598041) (← links)
- An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem (Q3605435) (← links)