Pages that link to "Item:Q4903793"
From MaRDI portal
The following pages link to Application of a Technique for Research and Development Program Evaluation (Q4903793):
Displaying 50 items.
- On latest starting times and floats in activity networks with ill-known durations (Q1869710) (← links)
- The construction of stable project baseline schedules (Q1877894) (← links)
- Statistical dependence through common risk factors: With applications in uncertainty analysis (Q1887792) (← links)
- An alternative for robust estimation in project management (Q1926759) (← links)
- Stochastic task networks -- trading performance for stability (Q2011606) (← links)
- A distributionally robust analysis of the program evaluation and review technique (Q2030655) (← links)
- Due-date quotation model for manufacturing system scheduling under uncertainty (Q2058567) (← links)
- Planning rolling stock maintenance: optimization of train arrival dates at a maintenance center (Q2076349) (← links)
- Managing risk-adjusted resource allocation for project time-cost tradeoffs (Q2095230) (← links)
- What if we increase the number of objectives? Theoretical and empirical implications for many-objective combinatorial optimization (Q2147143) (← links)
- Optimal crashing of an activity network with disruptions (Q2149579) (← links)
- Analysis of dependent data aggregated into intervals (Q2237827) (← links)
- Multi-factor dependence modelling with specified marginals and structured association in large-scale project risk assessment (Q2242316) (← links)
- An approximate dynamic programming approach to project scheduling with uncertain resource availabilities (Q2247268) (← links)
- Computing bounds on the expected maximum of correlated normal variables (Q2270188) (← links)
- A dependent project evaluation and review technique: a Bayesian network approach (Q2273925) (← links)
- Solving a tropical optimization problem with application to optimal scheduling (Q2282764) (← links)
- Risk taking in stochastic PERT networks (Q2367367) (← links)
- Proposal of a new distribution in PERT methodology (Q2430618) (← links)
- A new approximation algorithm for obtaining the probability distribution function for project completion time (Q2460585) (← links)
- Lower bound for the mean project completion time in dynamic PERT networks (Q2462112) (← links)
- Minimizing task completion time with the execution set method (Q2467305) (← links)
- Mixture densities for project management activity times: A robust approach to PERT (Q2470106) (← links)
- A link between two-sided power and asymmetric Laplace distributions: with applications to mean and variance approximations (Q2483864) (← links)
- Persistence in discrete optimization under data uncertainty (Q2502201) (← links)
- Developing activity duration specification limits for effective project control (Q2503086) (← links)
- The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times (Q2664350) (← links)
- A Decomposition Algorithm for Nested Resource Allocation Problems (Q2810553) (← links)
- The generalized two-sided power distribution (Q3184469) (← links)
- A Generic Algorithm for Approximately Solving Stochastic Graph Optimization Problems (Q3646120) (← links)
- A Note on Bounds for the Moments of a Stochastic Project Planniag Model Duration (Q3757672) (← links)
- Stochastic activity networks: a four-parameter approach for completion times (Q4311257) (← links)
- Project Management Decisions with Uncertain Targets (Q4691989) (← links)
- Some results on non-central beta distributions (Q4965725) (← links)
- Evaluating the project completion time when activity networks follow beta distribution (Q5164632) (← links)
- A New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project Network (Q5216837) (← links)
- The model identification of beta distribution based on quantiles (Q5220844) (← links)
- THE GENERALIZED BIPARABOLIC DISTRIBUTION (Q5324318) (← links)
- Algebraic methods applied to shortest path and maximum flow problems in stochastic networks (Q5326783) (← links)
- Reihenfolgeprobleme und Graphentheorie (Q5731299) (← links)
- Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology (Q5894527) (← links)
- Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology (Q5919228) (← links)
- The exact overall time distribution of a project with uncertain task durations (Q5928451) (← links)
- An approximation of the activity duration distribution in PERT. (Q5932340) (← links)
- Chance-constrained programming in activity networks: A critical evaluation (Q5935424) (← links)
- Critical path analysis in the network with fuzzy activity times (Q5951737) (← links)
- The computational complexity of the criticality problems in a network with interval activity times (Q5953342) (← links)
- On the conditional noncentral beta distribution (Q6067785) (← links)
- Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework (Q6109248) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)