Risk taking in stochastic PERT networks (Q2367367)

From MaRDI portal
scientific article
Language Label Description Also known as
English
Risk taking in stochastic PERT networks
scientific article

    Statements

    Risk taking in stochastic PERT networks (English)
    0 references
    25 October 1993
    0 references
    The paper introduces a new concept of defining a critical path in a PERT network with stochastic activity durations. For a given disutility function of a project manager a path is called critical if it has the greatest expected disutility. The author presents efficient methods for the identification of a critical path in the case of linear and exponential disutility functions, and independent activity durations. Moreover, it is shown how to determine the maximum fixed duration of an activity that does not change the critical path. Some results of the paper are similar to those known from the literature on shortest path problems in stochastic acyclic networks.
    0 references
    critical path
    0 references
    PERT network
    0 references
    stochastic activity durations
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers