Economic lot sizing for unreliable production system with shortages (Q1639502)

From MaRDI portal
Revision as of 04:10, 5 March 2024 by Import240304020342 (talk | contribs) (Set profile property.)
scientific article
Language Label Description Also known as
English
Economic lot sizing for unreliable production system with shortages
scientific article

    Statements

    Economic lot sizing for unreliable production system with shortages (English)
    0 references
    0 references
    0 references
    0 references
    13 June 2018
    0 references
    Summary: The purpose of the present study is to analyse the optimal lot size in an unreliable single-machine production system with shortages. The production system is subject to failure due to machine breakdown. Breakdown times are considered to be according to Weibull distribution. It is assumed that the shortages are allowed and backlogged. During each production, the set-up preventive (regular) maintenance is performed. The corrective (i.e., emergency) maintenance is carried out immediately after breakdown. For the illustration purpose, numerical results are provided for the special cases. To obtain the optimal cost per unit time, we also employ the artificial neuro-fuzzy inference system (ANFIS) approach which has the learning capability of neural network as well as advantages of rule-base fuzzy system. It is noted that the results obtained by neuro-fuzzy technique are at par with the results computed by the analytical techniques.
    0 references
    inventory
    0 references
    lot sizing
    0 references
    unreliable machine
    0 references
    preventive maintenance
    0 references
    shortage
    0 references
    adaptive networked-based fuzzy inference system
    0 references
    ANFIS
    0 references

    Identifiers