Single machine scheduling to minimize weighted earliness subject to no tardy jobs (Q1105480)

From MaRDI portal
Revision as of 01:58, 31 January 2024 by Import240129110113 (talk | contribs) (Added link to MaRDI item.)
scientific article
Language Label Description Also known as
English
Single machine scheduling to minimize weighted earliness subject to no tardy jobs
scientific article

    Statements

    Single machine scheduling to minimize weighted earliness subject to no tardy jobs (English)
    0 references
    0 references
    0 references
    1988
    0 references
    At first, the authors study the weighted earliness problem with the added constraint that no machine idle time is allowed. The problem is shown to be equivalent to a scheduling problem where the objective is to minimize the weighted completion time subject to no tardy jobs and the authors use the known results in order to solve their problem. A heuristic algorithm is provided and several cases of the weighted earliness problem with the added constraint that can be solved optimally by using this heuristic algorithm are identified. For the weighted earliness problem without the added constraint a heuristic algorithm is proposed and cases of the problem are identified for which this heuristic is optimal. Moreover a dynamic programming algorithm is given. Computational results for several control parameters to illustrate the proposed algorithms are also presented.
    0 references
    0 references
    dynamic goal programming
    0 references
    weighted earliness problem
    0 references
    weighted completion time
    0 references
    no tardy jobs
    0 references
    heuristic
    0 references

    Identifiers