A goal approach to assembly line balancing (Q2639768)

From MaRDI portal
Revision as of 07:12, 11 February 2024 by RedirectionBot (talk | contribs) (‎Changed an Item)
scientific article
Language Label Description Also known as
English
A goal approach to assembly line balancing
scientific article

    Statements

    A goal approach to assembly line balancing (English)
    0 references
    0 references
    0 references
    1990
    0 references
    The problem considered is one of assembly line balancing. The authors introduce a new model of the problem which allows for the flexibility to simultaneously consider variations in cycle time, number of workstations, zoning constraints, idle time and cost. A zero-one goal program is developed that allows the system designer to consider multiple criteria in selecting a preferred schedule.
    0 references
    assembly line balancing
    0 references
    variations in cycle time
    0 references
    zoning constraints
    0 references
    idle time
    0 references
    zero-one goal program
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references