The two-machine flowshop scheduling problem with total tardiness (Q1115798)

From MaRDI portal
Revision as of 13:08, 19 June 2024 by ReferenceBot (talk | contribs) (‎Changed an Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
The two-machine flowshop scheduling problem with total tardiness
scientific article

    Statements

    The two-machine flowshop scheduling problem with total tardiness (English)
    0 references
    0 references
    0 references
    0 references
    1989
    0 references
    This paper considers the criterion of minimizing total job tardiness in the two-machine flowshop system. The conditions that determine which of a pair of adjacent jobs in a sequence should precede the other to minimize total job tardiness are derived. A branch-and-bound solution procedure to reach an optimal solution to the problem is developed. A simple and computationally efficient heuristic is also presented. Moreover, an illustrative example together with the computational characteristics of the algorithm and the heuristic is provided.
    0 references
    total job tardiness
    0 references
    two-machine flowshop
    0 references
    branch-and-bound
    0 references
    heuristic
    0 references