Jean Marie Proth

From MaRDI portal
Revision as of 08:46, 24 September 2023 by Import230924090903 (talk | contribs) (Created automatically from import230924090903)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Person:1079483

Available identifiers

zbMath Open proth.jean-marieWikidataQ33133287 ScholiaQ33133287MaRDI QIDQ1079483

List of research outcomes





PublicationDate of PublicationType
On-Line Scheduling In Assembly Processes2023-04-24Paper
Minimizing the number of machines for minimum length schedules2009-12-07Paper
Opportunistic supply chain formation from qualified partners for a new market demand2009-10-15Paper
Optimisation of multi-position machines and transfer lines2007-12-10Paper
Scheduling in supply chain environment2007-08-27Paper
Single machine scheduling and due date assignment under series-parallel precedence constraints2006-06-12Paper
Strategic capacity planning in supply chain design for a new market opportunity2005-04-26Paper
https://portal.mardi4nfdi.de/entity/Q46670872005-04-19Paper
https://portal.mardi4nfdi.de/entity/Q31592242005-02-15Paper
Insertion of a random task in a schedule: a real-time approach2005-02-09Paper
Insertion of a random bitask in a schedule: a real-time approach2004-06-15Paper
The concave cost supply problem.2003-06-09Paper
Multifunction radar: Task scheduling2003-04-27Paper
Computation of pair placement of geometric objects2002-09-13Paper
A survey of the state-of-the-art of common due date assignment and scheduling research2002-06-16Paper
Marking optimization of stochastic timed event graphs using IPA2001-06-25Paper
Improving job-shop schedules through critical pairwise exchanges2001-01-02Paper
Heuristics for unrelated machine scheduling with precedence constraints2000-12-17Paper
Prediction of average queue length in manufacturing resources at the time of new lot arrival2000-11-01Paper
Electric vehicles: effect of the availability threshold on the transportation cost2000-11-01Paper
On-line scheduling in a surface treatment system2000-03-19Paper
The simple and multiple job assignment problems2000-01-01Paper
The cutting stock problem with mixed objectives: Two heuristics based on dynamic programming1999-08-02Paper
A dual ascent approach to the fixed-charge capacitated network design problem1999-02-22Paper
Heuristic approaches for \(n/m/F/\sum C_i\) scheduling problems1999-02-22Paper
Heuristic procedures for minimizing makespan and the number of required pallets1998-07-14Paper
Finite capacity flow control in a multi-stage/multi-product environment1998-06-11Paper
https://portal.mardi4nfdi.de/entity/Q43568881997-10-05Paper
https://portal.mardi4nfdi.de/entity/Q43326951997-02-13Paper
Production management in a Petri net environment1996-10-24Paper
https://portal.mardi4nfdi.de/entity/Q47636011996-03-18Paper
https://portal.mardi4nfdi.de/entity/Q47636141996-03-18Paper
Cycle time of stochastic event graphs: evaluation and marking optimization1994-09-25Paper
A comprehensive approach of planning and scheduling based on petri nets1994-09-08Paper
Some open problems in the design and use of modern production systems1994-07-04Paper
Supply management in assembly systems1994-04-19Paper
https://portal.mardi4nfdi.de/entity/Q40166741993-01-16Paper
Optimisation of invariant criteria for event graphs1992-09-27Paper
https://portal.mardi4nfdi.de/entity/Q40014881992-09-18Paper
https://portal.mardi4nfdi.de/entity/Q39877871992-06-28Paper
CLASS: Computerized LAyout Solutions using Simulated annealing1992-06-28Paper
https://portal.mardi4nfdi.de/entity/Q39857211992-06-27Paper
A demand-to-manufacturing-requirement model based on predefined configurations1992-06-26Paper
Simulation studies in JIT production1992-01-01Paper
https://portal.mardi4nfdi.de/entity/Q52020201991-01-01Paper
Fast evaluation of an unreliable transfer line with limited transportation devices1990-01-01Paper
Existence of Forecast Horizons in Undiscounted Discrete-Time Lot Size Models1990-01-01Paper
Performance evaluation of job-shop systems using timed event-graphs1989-01-01Paper
https://portal.mardi4nfdi.de/entity/Q37807351988-01-01Paper
Analyse de fabrications non linéaires et répétitives à l'aide de graphes d'événements temporisés1988-01-01Paper
Study Of A Closed Loop Conveyor System1987-01-01Paper
A top-down hierarchical classification method1987-01-01Paper
Quasi-linear production systems: Optimization of the transportation system1986-01-01Paper
https://portal.mardi4nfdi.de/entity/Q37277241986-01-01Paper
https://portal.mardi4nfdi.de/entity/Q37303161986-01-01Paper
https://portal.mardi4nfdi.de/entity/Q37513611986-01-01Paper
https://portal.mardi4nfdi.de/entity/Q36774641985-01-01Paper
https://portal.mardi4nfdi.de/entity/Q36913801985-01-01Paper
https://portal.mardi4nfdi.de/entity/Q36968441985-01-01Paper
Group technology in production management: The short horizon planning level1985-01-01Paper
Inventory planning in a deterministic environment: Continuous time model with concave costs1984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q32171831984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q32203311984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33309331984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33327221984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33355101984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q36789421983-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33371791982-01-01Paper
https://portal.mardi4nfdi.de/entity/Q36594921982-01-01Paper
https://portal.mardi4nfdi.de/entity/Q39147211981-01-01Paper
https://portal.mardi4nfdi.de/entity/Q39518931981-01-01Paper
https://portal.mardi4nfdi.de/entity/Q56636291973-01-01Paper

Research outcomes over time

This page was built for person: Jean Marie Proth