Pages that link to "Item:Q1806880"
From MaRDI portal
The following pages link to Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880):
Displayed 50 items.
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (Q1590044) (← links)
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055) (← links)
- Resource-constrained flowshop scheduling with separate resource recycling operations (Q1762095) (← links)
- An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs (Q1762128) (← links)
- Generating two-terminal directed acyclic graphs with a given complexity index by constraint logic programming (Q1764795) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- A hybrid framework for over-constrained generalized resource-constrained project scheduling problems (Q1768898) (← links)
- Justification and RCPSP: a technique that pays (Q1772841) (← links)
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects (Q1841162) (← links)
- PERT scheduling with convex cost functions. (Q1853737) (← links)
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags (Q1869389) (← links)
- Genetic algorithm solution for a risk-based partner selection problem in a virtual enterprise (Q1869897) (← links)
- A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling (Q1885984) (← links)
- Optimizing the supply chain configuration for make-to-order manufacturing (Q1926828) (← links)
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP (Q1954712) (← links)
- A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations (Q1955186) (← links)
- Effective neighbourhood functions for the flexible job shop problem (Q1976516) (← links)
- A learning-based optimization approach to multi-project scheduling (Q2018943) (← links)
- Metaheuristics for multi-mode capital-constrained project payment scheduling (Q2253378) (← links)
- Skill-based framework for optimal software project selection and resource allocation (Q2256202) (← links)
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244) (← links)
- On scheduling credited projects (Q2261744) (← links)
- Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm (Q2268503) (← links)
- Dominance breaking constraints (Q2342647) (← links)
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods (Q2356015) (← links)
- A classification of assembly line balancing problems (Q2371356) (← links)
- The resource-constrained modulo scheduling problem: an experimental study (Q2377171) (← links)
- Managing and modelling general resource transfers in (multi-)project scheduling (Q2379662) (← links)
- Scheduling and staffing multiple projects with a multi-skilled workforce (Q2379671) (← links)
- A Boolean satisfiability approach to the resource-constrained project scheduling problem (Q2430594) (← links)
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q2432851) (← links)
- A hybrid metaheuristic for the resource-constrained project scheduling problem (Q2433434) (← links)
- Worst case analysis of decomposed software pipelining for cyclic unitary RCPSP with precedence delays (Q2434252) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- An improved MIP-based approach for a multi-skill workforce scheduling problem (Q2434289) (← links)
- Solving RCPSP/max by lazy clause generation (Q2434317) (← links)
- Scheduling the two-machine open shop problem under resource constraints for setting the jobs (Q2449360) (← links)
- A hybrid genetic algorithm for the resource-constrained project scheduling problem (Q2455614) (← links)
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times (Q2467268) (← links)
- Discrete-continuous project scheduling with discounted cash flows - a tabu search approach (Q2468474) (← links)
- Hypernetworks in a directed hypergraph (Q2470103) (← links)
- A market-based multi-agent system model for decentralized multi-project scheduling (Q2480205) (← links)
- A master surgical scheduling approach for cyclic scheduling in operating room departments (Q2481565) (← links)
- Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem (Q2482379) (← links)
- Pre-emption in resource-constrained project scheduling (Q2482791) (← links)
- An evolutionary approach to rehabilitation patient scheduling: A case study (Q2482797) (← links)
- Dynamic transport scheduling under multiple resource constraints (Q2485330) (← links)
- A branch-and-cut algorithm for scheduling of projects with variable-intensity activities (Q2487846) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- Bicriteria train scheduling for high-speed passenger railroad planning applications (Q2566708) (← links)