Flow shop scheduling with peak power consumption constraints
From MaRDI portal
Publication:363556
DOI10.1007/s10479-012-1294-zzbMath1271.90032OpenAlexW1993084500MaRDI QIDQ363556
Nelson A. Uhan, John W. Sutherland, Kan Fang, Fu Zhao
Publication date: 3 September 2013
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-012-1294-z
Related Items (14)
Scheduling on a single machine under time-of-use electricity tariffs ⋮ Improved mixed-integer linear programming model and heuristics for bi-objective single-machine batch scheduling with energy cost consideration ⋮ Exact method to optimize the total electricity cost in two-machine permutation flow shop scheduling problem under time-of-use tariff ⋮ Matheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardiness ⋮ Energy-efficient scheduling in manufacturing companies: a review and research framework ⋮ Carbon-efficient scheduling of flow shops by multi-objective optimization ⋮ Energy-efficient bi-objective single-machine scheduling with power-down mechanism ⋮ A multi-objective differential evolution algorithm for parallel batch processing machine scheduling considering electricity consumption cost ⋮ Minimizing the total tardiness and the total carbon emissions in the permutation flow shop scheduling problem ⋮ Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint ⋮ Optimising makespan and energy consumption in task scheduling for parallel systems ⋮ Flow shop for dual CPUs in dynamic voltage scaling ⋮ A bi-objective heuristic approach for green identical parallel machine scheduling ⋮ Flow Shop for Dual CPUs in Dynamic Voltage Scaling
Cites Work
- Unnamed Item
- Unnamed Item
- Speed Scaling with an Arbitrary Power Function
- Speed scaling to manage energy and temperature
- The Complexity of Flowshop and Jobshop Scheduling
- Comparative evaluation of MILP flowshop models
- Operational methods for minimization of energy consumption of manufacturing equipment
- On the Flow-Shop Sequencing Problem with No Wait in Process†
This page was built for publication: Flow shop scheduling with peak power consumption constraints