Flow shop for dual CPUs in dynamic voltage scaling
In this paper a flow shop scheduling problem on two processors is considered. Here the objective is to find a feasible schedule such that all jobs are completed by the common deadline with minimized energy consumption. A new model, called sense-and-aggregate, is proposed, motivated by data aggregation in wireless sensor networks where the base station needs to receive data from sensors and then compute a single aggregate result. In this model, the first processor will receive unit-size data from sensors and the second processor is responsible for calculating the aggregate result. Depending on the model, the aggregation function can be different, and an algorithm whose time complexity depends on the aggregation function is proposed. The performance of the flow shop problem when the order of jobs is fixed is investigated by comparing it to the approximation algorithm with an arbitrary order.
- Algorithms for dynamic speed scaling
- DVS scheduling in a line or a star network of processors
- Dynamic voltage scaling under EDF revisited
- Flow shop scheduling with peak power consumption constraints
- scientific article; zbMATH DE number 1306870 (Why is no real title available?)
- Optimal two- and three-stage production schedules with set-up time included
- Scheduling algorithms
This page was built for publication: Flow shop for dual CPUs in dynamic voltage scaling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1986559)