A constructive heuristic for staff scheduling in the Glass industry
From MaRDI portal
Publication:490177
DOI10.1007/s10479-013-1525-yzbMath1303.90051OpenAlexW1967291668MaRDI QIDQ490177
Maria Antónia Carravilla, José Fernando Oliveira, Marta Rocha
Publication date: 22 January 2015
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-013-1525-y
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
Cites Work
- An implicit goal programming model for the tour scheduling problem considering the employee work preferences
- Building better nurse scheduling algorithms
- Solving the problem of rerostering nurse schedules with hard constraints: new multicommodity flow models
- Implicit shift scheduling with multiple breaks and work stretch duration restrictions
- The nurse rostering problem: a critical appraisal of the problem structure
- A hybrid model of integer programming and variable neighbourhood search for highly-constrained nurse rostering problems
- A sequential integer programming method for discontinuous labor tour scheduling
- Staff scheduling and rostering: a review of applications, methods and models.
- Staff scheduling at the United States postal Service
- Survey, categorization, and comparison of recent tour scheduling literature
- Multi-skilled workforce optimisation
- Personnel scheduling: a literature review
- An integer programming model for hierarchical workforce scheduling problem
- The state of the art of nurse rostering
- A branch-and-price approach for large-scale employee tour scheduling problems
- Variable employee productivity in workforce scheduling
- The art and science of designing rotating schedules
- A general multi-shift scheduling system
- A memetic approach to the nurse rostering problem