Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
From MaRDI portal
Publication:632667
DOI10.1016/j.cor.2010.10.018zbMath1208.90062MaRDI QIDQ632667
Publication date: 25 March 2011
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2010.10.018
90B06: Transportation, logistics and supply chain management
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
Related Items
Bicriteria Scheduling on a Single Batching Machine with Transportation and Deterioration to Minimize Total Completion Time and Production Costs, Flow shop scheduling problems with transportation constraints revisited, An improved two-machine flowshop scheduling with intermediate transportation, Coordination of production and interstage batch delivery with outsourced distribution, Hybrid flowshop scheduling with interstage job transportation, Flowshop scheduling with interstage job transportation, A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times, An improved algorithm for integrated production and distribution scheduling problem with committed delivery dates, Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Improved algorithms for two single machine scheduling problems
- On the machine scheduling problem with job delivery coordination
- Machine scheduling with job delivery coordination
- Optimal two- and three-stage production schedules with setup times included
- Machine scheduling with transportation considerations