Lixin Tang

From MaRDI portal
Person:203128

Available identifiers

zbMath Open tang.lixinWikidataQ83361323 ScholiaQ83361323MaRDI QIDQ203128

List of research outcomes





PublicationDate of PublicationType
A decomposition method for the group-based quay crane scheduling problem2024-07-29Paper
A metaheuristic algorithm for a locomotive routing problem arising in the steel industry2023-07-10Paper
https://portal.mardi4nfdi.de/entity/Q50478192022-11-17Paper
A reinforcement learning approach for dynamic multi-objective optimization2021-12-01Paper
An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability2021-06-04Paper
MOEA/D with a self-adaptive weight vector adjustment strategy based on chain segmentation2021-04-19Paper
Evolution of global contribution in multi-level threshold public goods games with insurance compensation2021-03-02Paper
Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading2020-02-05Paper
Parallel machine scheduling with batch deliveries to minimize total flow time and delivery cost2019-05-02Paper
A weak finite element method for elliptic problems in one space dimension2019-03-20Paper
Models and algorithms for shuffling problems in steel plants2019-03-05Paper
A Benders decomposition-based framework for solving quay crane scheduling problems2018-11-19Paper
A machine-learning based memetic algorithm for the multi-objective permutation flowshop scheduling problem2018-07-11Paper
A Discontinuous Finite Volume Element Method Based on Bilinear Trial Functions2018-06-07Paper
连铸-轧制混流生产模式下轧批调度问题的分支-定价算法2018-05-25Paper
Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine2018-02-06Paper
Novel time-space network flow formulation and approximate dynamic programming approach for the crane scheduling in a coil warehouse2017-12-06Paper
The Gradient Superconvergence of Bilinear Finite Volume Element for Elliptic Problems2017-10-20Paper
Open shop scheduling problem to minimize makespan with release dates2016-12-05Paper
Solution method for the location planning problem of logistics park with variable capacity2016-11-11Paper
Finite volume method for the variational inequalities of first and second kinds2016-03-21Paper
Superconvergence of the stable \(P_1\)-\(P_1\) finite element pair for Stokes problem2016-03-18Paper
A branch-and-cut algorithm for factory crane scheduling problem2015-12-16Paper
A stabilized finite volume method for Stokes equations using the lowest order \(P_1-P_0\) element pair2015-12-07Paper
https://portal.mardi4nfdi.de/entity/Q31935702015-10-28Paper
Modeling and solution of the joint quay crane and truck scheduling problem2015-02-03Paper
Integrated Charge Batching and Casting Width Selection at Baosteel2014-11-26Paper
An improved Benders decomposition algorithm for the logistics facility location problem with capacity expansions2014-03-31Paper
A stochastic production planning problem with nonlinear cost2012-11-15Paper
A new Lagrangian Relaxation Algorithm for scheduling dissimilar parallel machines with release dates2011-11-25Paper
Performance analysis of rotation schedule and improved strategy for open shop problem to minimise makespan2011-11-25Paper
A combination of Lagrangian relaxation and column generation for order batching in steelmaking and continuous-casting production2011-06-09Paper
Two-machine flowshop scheduling with intermediate transportation under job physical space consideration2011-03-25Paper
https://portal.mardi4nfdi.de/entity/Q30524782010-11-05Paper
New heuristics for flow shop problem to minimize makespan2010-10-14Paper
https://portal.mardi4nfdi.de/entity/Q35723902010-07-08Paper
https://portal.mardi4nfdi.de/entity/Q35715202010-07-08Paper
An efficient optimal solution to the coil sequencing problem in electro-galvanizing line2010-06-11Paper
A new heuristic for open shop total completion time problem2010-05-02Paper
The coordination of transportation and batching scheduling2010-04-24Paper
A hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup times2010-03-18Paper
A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times2009-12-22Paper
Simultaneously scheduling multiple turns for steel color-coating production2009-12-07Paper
https://portal.mardi4nfdi.de/entity/Q36401942009-11-11Paper
Modelling and a segmented dynamic programming-based heuristic approach for the slab stack shuffling problem2009-10-15Paper
Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration2009-09-05Paper
A hybrid two-stage transportation and batch scheduling problem2009-08-23Paper
Scheduling with Agreeable Release Times and Due Dates on a Single Continuous Batch Processing Machine2009-07-22Paper
https://portal.mardi4nfdi.de/entity/Q53200382009-07-22Paper
Minimizing makespan in a two-machine flowshop scheduling with batching and release time2009-07-20Paper
Scheduling of a single crane in batch annealing process2009-05-19Paper
Worst Case Analysis of a New Lower Bound for Flow Shop Weighted Completion Time Problem2009-03-03Paper
A population-based variable neighborhood search for the single machine total weighted tardiness problem2009-02-12Paper
Dynamically scheduling ships to multiple continuous berth spaces in an iron and steel complex2009-02-10Paper
Model and Solution for the Multilevel Production-Inventory System Before Ironmaking in Shanghai Baoshan Iron and Steel Complex2009-02-10Paper
A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers2008-11-20Paper
Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine2008-07-10Paper
The Coordination of Two Parallel Machines Scheduling and Batch Deliveries2008-07-10Paper
A Two-Stage Flexible Flowshop Problem with Deterioration2008-07-10Paper
An iterated local search heuristic for the capacitated prize-collecting travelling salesman problem2008-05-09Paper
https://portal.mardi4nfdi.de/entity/Q57552422007-08-20Paper
https://portal.mardi4nfdi.de/entity/Q57552822007-08-20Paper
Improving the efficiency of iron and steel purchasing using supply chain coordination2007-06-14Paper
A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex2007-06-13Paper
A branch-and-price algorithm to solve the molten iron allocation problem in iron and steel industry2007-04-26Paper
Hybrid backward and forward dynamic programming based Lagrangian relaxation for single machine scheduling2007-04-13Paper
Scheduling a hybrid flowshop with batch production at the last stage2007-04-13Paper
https://portal.mardi4nfdi.de/entity/Q34142432007-01-08Paper
https://portal.mardi4nfdi.de/entity/Q54922032006-10-13Paper
https://portal.mardi4nfdi.de/entity/Q54843762006-08-17Paper
A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time2006-08-14Paper
Lagrangian relaxation algorithms for real-time hybrid flowshop scheduling with finite intermediate buffers2006-05-26Paper
https://portal.mardi4nfdi.de/entity/Q54698682006-05-26Paper
Advances in Neural Networks – ISNN 20052005-11-23Paper
Steel-making process scheduling using Lagrangian relaxation2004-01-11Paper
A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex2003-11-24Paper
https://portal.mardi4nfdi.de/entity/Q45471772003-07-17Paper
https://portal.mardi4nfdi.de/entity/Q45383192002-07-11Paper
A review of planning and scheduling systems and methods for integrated steel production2002-07-08Paper
A new algorithm of the CSLLSP in CIMS2002-01-16Paper
Performance evaluation of a flexible machining/assembly system and routing comparisons2002-01-01Paper
The model and algorithm for the order planning of the steel plant2001-05-21Paper
A mathematical programming model for scheduling steelmaking-continuous casting production2000-03-19Paper
https://portal.mardi4nfdi.de/entity/Q42267391999-02-02Paper

Research outcomes over time

This page was built for person: Lixin Tang