Improvement of earliness and lateness by postponement on an automotive production line
From MaRDI portal
Publication:930141
DOI10.1007/s10696-007-9022-8zbMath1145.90369OpenAlexW2089761050MaRDI QIDQ930141
Publication date: 23 June 2008
Published in: International Journal of Flexible Manufacturing Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10696-007-9022-8
SimulationJust-in-time production systemMixed-model production linePostponementPresequencingResequencing
Related Items
Cites Work
- On the complexity of the car sequencing problem.
- Assembly line balancing in a mixed-model sequencing environment with synchronous transfers.
- Minimizing variation of production rates in just-in-time systems: A survey
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Sequencing jobs on an automobile assembly line: objectives and procedures
- Least in-sequence probability heuristic for mixed-volume production lines
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
This page was built for publication: Improvement of earliness and lateness by postponement on an automotive production line