Real-time scheduling of an automated manufacturing center
From MaRDI portal
Publication:1116883
DOI10.1016/0377-2217(89)90332-9zbMath0665.90047OpenAlexW1968795611MaRDI QIDQ1116883
Narayan Raman, F. Brian Talbot, Ram V. Rachamadugu
Publication date: 1989
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/2027.42/27935
flexible manufacturing systemssimulationdynamic schedulingimplicit enumerationrolling-horizonmean flow timebatch sizeautomated manufacturingmean tardiness
Related Items (14)
Efficient local search limitation strategy for single machine total weighted tardiness scheduling with sequence-dependent setup times ⋮ Scatter search for minimizing weighted tardiness in a single machine scheduling with setups ⋮ Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times ⋮ Rescheduling problems with agreeable job parameters to minimize the tardiness costs under deterioration and disruption ⋮ Simulated annealing algorithm for solving the single machine early/tardy problem ⋮ Beam search algorithms for the single machine total weighted tardiness scheduling problem with sequence-dependent setups ⋮ Parts routing in a felxible manufacturing system with time-varying demands ⋮ A memetic algorithm for the total tardiness single machine scheduling problem ⋮ A bicriteria scheduling with sequence-dependent setup times ⋮ Scheduling jobs on parallel machines with sequence-dependent setup times ⋮ Sequencing jobs for an automated manufacturing module with buffer ⋮ A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems ⋮ Enhancing stochastic search performance by value-biased randomization of heuristics ⋮ The job shop tardiness problem: A decomposition approach
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- New directions in scheduling theory
- Batching in single operation manufacturing systems
- Multi-item batching heuristics for minimization of queueing delays
- Batching to Minimize Flow Times on One Machine
- A Branch and Bound Algorithm for the Total Weighted Tardiness Problem
- Models for Design and Control of Stochastic, Multi-Item Batch Production Systems
- Lot Sizes, Lead Times and In-Process Inventories
- Technical Note—A Note on the Weighted Tardiness Problem
- A Review of Production Scheduling
- Minimizing Total Costs in One-Machine Scheduling
- On general routing problems
- The Time-Dependent Traveling Salesman Problem and Its Application to the Tardiness Problem in One-Machine Scheduling
- Finding an Optimal Sequence by Dynamic Programming: An Extension to Precedence-Related Tasks
- An experimental comparison of solution algorithms for the single-machine tardiness problem
- Note—Lot-Sizing and Sequencing Delays
- A hybrid algorithm for the one machine sequencing problem to minimize total tardiness
- On the N-Job One-Machine, Sequence-Independent Scheduling Problem with Tardiness Penalties: A Branch-Bound Solution
This page was built for publication: Real-time scheduling of an automated manufacturing center