Real-time scheduling of an automated manufacturing center (Q1116883)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 4089304
Language Label Description Also known as
default for all languages
No label defined
    English
    Real-time scheduling of an automated manufacturing center
    scientific article; zbMATH DE number 4089304

      Statements

      Real-time scheduling of an automated manufacturing center (English)
      0 references
      0 references
      0 references
      0 references
      1989
      0 references
      This paper investigates the dynamic scheduling of an automated manufacturing workcenter at which jobs are processed in batches, and there is a constant changeover time between batches of different part types. The primary measures of schedule performance are mean flow time and mean tardiness. The dynamic scheduling problem is treated as a series of static problems which are solved on a rolling-horizon basis. Characteristics of the optimal solutions to the mean flow time and mean tardiness problems are developed, and an implicit enumeration approach to the mean tardiness problem is proposed. These results are used for constructing efficient scheduling procedures for the dynamic problem. We also derive the steady state relationship between workcenter utilization level, batch size and mean flow time for one and two part types. A simulation study extends this relationship to a larger number of part types.
      0 references
      flexible manufacturing systems
      0 references
      dynamic scheduling
      0 references
      automated manufacturing
      0 references
      mean flow time
      0 references
      mean tardiness
      0 references
      rolling-horizon
      0 references
      implicit enumeration
      0 references
      batch size
      0 references
      simulation
      0 references

      Identifiers