Vehicle scheduling in two-cycle flexible manufacturing systems

From MaRDI portal
Revision as of 13:25, 31 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1341395

DOI10.1016/0895-7177(94)90203-8zbMath0810.90062OpenAlexW2151157535WikidataQ57387891 ScholiaQ57387891MaRDI QIDQ1341395

Gerhard J. Woeginger, Jacek Błażewicz, Gerd Finke, Rainer E. Burkard

Publication date: 11 January 1995

Published in: Mathematical and Computer Modelling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0895-7177(94)90203-8




Related Items (11)




Cites Work




This page was built for publication: Vehicle scheduling in two-cycle flexible manufacturing systems