Time-optimal control in a single machine problem with resource constraints (Q1086143)

From MaRDI portal
Revision as of 16:57, 12 July 2023 by Importer (talk | contribs) (‎Created a new Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
Time-optimal control in a single machine problem with resource constraints
scientific article

    Statements

    Time-optimal control in a single machine problem with resource constraints (English)
    0 references
    0 references
    0 references
    1986
    0 references
    The paper deals with time-optimal control of performance of jobs on a single machine. It is assumed that each job is available for processing at the moment which is a positive strictly decreasing continuous function with respect to the amount of a constrained resource (e.g. fuel, raw materials). An algorithm of finding the time-optimal control, i.e. time- optimal permutation of jobs with resource allocation, is presented.
    0 references
    time-optimal control
    0 references
    performance of jobs on a single machine
    0 references
    constrained resource
    0 references
    resource allocation
    0 references

    Identifiers