Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times

From MaRDI portal
Revision as of 07:43, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1735381


DOI10.1016/j.amc.2017.01.004zbMath1411.90154MaRDI QIDQ1735381

Liang Gao, Xinyu Li, Kai-Zhou Gao, Quan-ke Pan

Publication date: 28 March 2019

Published in: Applied Mathematics and Computation (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.amc.2017.01.004


90B35: Deterministic scheduling theory in operations research

90C59: Approximation methods and heuristics in mathematical programming