Production planning in furniture settings via robust optimization

From MaRDI portal
Revision as of 08:06, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1761958

DOI10.1016/j.cor.2011.02.022zbMath1251.90011OpenAlexW2000120419WikidataQ57719465 ScholiaQ57719465MaRDI QIDQ1761958

Reinaldo Morabito, Douglas J. Alem

Publication date: 15 November 2012

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2011.02.022




Related Items

Mathematical models and a heuristic method for the multiperiod one-dimensional cutting stock problemRobust vertex \(p\)-center model for locating urgent relief distribution centersThe integrated lot sizing and cutting stock problem with saw cycle constraints applied to furniture productionA computational study of the general lot-sizing and scheduling model under demand uncertainty via robust and stochastic approachesProduction planning with order acceptance and demand uncertaintyCutting and packing problems under uncertainty: literature review and classification frameworkComparison of different approaches to multistage lot sizing with uncertain demandBilevel programming approaches to production planning for multiple products with short life cyclesRegularized methods for a two-stage robust production planning problem and its sample average approximationOne-dimensional stock cutting resilient against singular random defectsThe robust multi-plant capacitated lot-sizing problemProgressive Selection Method for the Coupled Lot-Sizing and Cutting-Stock ProblemRobust supply chain network design: an optimization model with real world applicationRobust inventory control under demand and lead time uncertaintyAn uncertain furniture production planning problem with cumulative service levelsA robust optimization approach for the unrelated parallel machine scheduling problemRisk-averse two-stage stochastic programs in furniture plantsAn extended goal programming model for the multiobjective integrated lot-sizing and cutting stock problemRobust Optimization of Sums of Piecewise Linear Functions with Application to Inventory ProblemsA robust possibilistic programming model for a responsive closed loop supply chain network designClassification and literature review of integrated lot-sizing and cutting stock problemsA robust optimization approach for an integrated dynamic cellular manufacturing system and production planning with unreliable machinesNovel robust fuzzy mathematical programming methodsA robust optimization model for humanitarian relief chain design under uncertaintyMaster production schedule using robust optimization approaches in an automobile second-tier supplierThe integrated lot sizing and cutting stock problem in an automotive spring factoryA bi-integrated model for coupling lot-sizing and cutting-stock problemsRobust inventory problem with budgeted cumulative demand uncertainty



Cites Work


This page was built for publication: Production planning in furniture settings via robust optimization