A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock
From MaRDI portal
Publication:1761198
DOI10.1016/j.cor.2012.01.002zbMath1251.90188OpenAlexW2016851500MaRDI QIDQ1761198
Eng Wah Lee, Stephen John Turner, Malcolm Yoke Hean Low, Mojtaba Shakeri
Publication date: 15 November 2012
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2012.01.002
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Discrete location and assignment (90B80)
Related Items (9)
Synchronization in cross-docking networks: a research classification and framework ⋮ Heuristics for cross-docking scheduling of truck arrivals, truck departures and shop-floor operations ⋮ Network scheduling problem with cross-docking and loading constraints ⋮ Integrated truck and workforce scheduling to accelerate the unloading of trucks ⋮ A novel cross docking system for distributing the perishable products considering preemption: a machine learning approach ⋮ Comparing an approximate queuing approach with simulation for the solution of a cross-docking problem ⋮ Integrated scheduling and assignment of trucks at unit-load cross-dock terminals with mixed service mode dock doors ⋮ A comparison of random walks in dependent random environments ⋮ A mixed integer programming model for solving real-time truck-to-door assignment and scheduling problem at cross docking warehouse
Cites Work
- Truck dock assignment problem with operational time constraint within crossdocks
- Minimizing makespan in two-stage hybrid cross docking scheduling problem
- Scheduling inbound and outbound trucks at cross docking terminals
- Minimizing the makespan in a two-machine cross-docking flow shop problem
- Truck Dock Assignment Problem with Time Windows and Capacity Constraint in Transshipment Network Through Crossdocks
- Crossdocking— Just in Time scheduling: an alternative solution approach
- Crossdocking—JIT scheduling with time windows
- The Effects of Trailer Scheduling on the Layout of Freight Terminals
- Depth-First Search and Linear Graph Algorithms
This page was built for publication: A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock