Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities

From MaRDI portal
Revision as of 07:21, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1762135

DOI10.1016/j.cor.2011.08.017zbMath1251.90202OpenAlexW2024730084MaRDI QIDQ1762135

Chou-Jung Hsu, Suh-Jenq Yang, Dar-Li Yang, Cheng, T. C. Edwin

Publication date: 15 November 2012

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2011.08.017




Related Items (18)

Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effectsA comparison of mixed-integer linear programming models for workforce scheduling with position-dependent processing timesParallel-machine scheduling with maintenance: praising the assignment problemParallel machine scheduling to minimize the makespan with sequence dependent deteriorating effectsMakespan minimization flowshop with position dependent job processing times -- computational complexity and solution algorithmsA scheduling problem with three competing agentsScheduling on parallel processors with varying processing timesInterrelations among SMED stages: a causal modelIterated greedy with random variable neighborhood descent for scheduling jobs on parallel machines with deterioration effectThe computational complexity analysis of the two-processor flowshop problems with position dependent job processing timesSingle-machine scheduling with accelerating deterioration effectsSingle-machine scheduling with piece-rate maintenance and interval constrained position-dependent processing timesSolution methods for scheduling problems with sequence-dependent deterioration and maintenance eventsMultitasking scheduling problems with deterioration effectFlow shop scheduling problem with position-dependent processing timesUnrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion timeSingle-machine scheduling problems with machine aging effect and an optional maintenance activityProduction, maintenance and resource scheduling: a review



Cites Work


This page was built for publication: Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities