A heuristic to schedule flexible job-shop in a glass factory
From MaRDI portal
Publication:1772853
DOI10.1016/j.ejor.2004.04.020zbMath1066.90538MaRDI QIDQ1772853
Publication date: 21 April 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2004.04.020
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
90B30: Production models
90B90: Case-oriented studies in operations research
Cites Work
- Extending the shifting bottleneck procedure to real-life applications
- Tabu search for the job-shop scheduling problem with multi-purpose machines
- An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search
- Approximative procedures for no-wait job shop scheduling.
- Project scheduling. A research handbook.
- Sequencing of jobs in some production system
- Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing
- A comparative study of dispatching rules in dynamic flowshops and jobshops
- Job-shop scheduling with blocking and no-wait constraints
- A mathematical programming model for scheduling steelmaking-continuous casting production
- Routing and scheduling in a flexible job shop by tabu search
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry