A heuristic to schedule flexible job-shop in a glass factory

From MaRDI portal
Revision as of 08:50, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1772853


DOI10.1016/j.ejor.2004.04.020zbMath1066.90538MaRDI QIDQ1772853

Xianqiang Yang

Publication date: 21 April 2005

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2004.04.020


90B35: Deterministic scheduling theory in operations research

90C59: Approximation methods and heuristics in mathematical programming

90B30: Production models

90B90: Case-oriented studies in operations research




Cites Work