Two machine mixed shop scheduling problem with controllable machine speeds
From MaRDI portal
Publication:1821024
DOI10.1016/0166-218X(87)90005-9zbMath0615.90061OpenAlexW2100173285MaRDI QIDQ1821024
Toshio Nishida, Hiroaki Ishii, Teruo Masuda
Publication date: 1987
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0166-218x(87)90005-9
optimal scheduleuniform machinestwo machine schedulingmixed shop schedulingcontrollable speedoptimal machine speed pair
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)
Related Items (9)
One machine scheduling problem with fuzzy duedates ⋮ Two-machine flowshop minimum-length scheduling problem with random and bounded processing times ⋮ Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches ⋮ Optimal choice of machine speeds for two-stage non-homogeneous systems ⋮ Optimal makespan scheduling with given bounds of processing times ⋮ Scheduling problems with rejection to minimize the \(k\)-th power of the makespan plus the total rejection cost ⋮ Single machine scheduling with rejection to minimize the \(k\)-th power of the makespan ⋮ Single machine scheduling with controllable release and processing parameters ⋮ Two machine flow shop scheduling problem with no wait in process: Controllable machine speeds
Cites Work
- The mixed shop scheduling problem
- Optimal two- and three-stage production schedules with setup times included
- A Generalized Uniform Processor System
- Combinatorial Optimization with Rational Objective Functions
- Open Shop Scheduling to Minimize Finish Time
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
This page was built for publication: Two machine mixed shop scheduling problem with controllable machine speeds