Two machine mixed shop scheduling problem with controllable machine speeds (Q1821024)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 3997539
Language Label Description Also known as
default for all languages
No label defined
    English
    Two machine mixed shop scheduling problem with controllable machine speeds
    scientific article; zbMATH DE number 3997539

      Statements

      Two machine mixed shop scheduling problem with controllable machine speeds (English)
      0 references
      0 references
      0 references
      0 references
      1987
      0 references
      The paper considers a two machine scheduling problem in which the objective is to determine an optimal machine speed pair and an optimal schedule. Each job consists of two operations. We have a mixed shop scheduling problem which means that for a subset of the jobs the order of processing on the machines is fixed (flow shop) and for the remaining jobs the order is free (open shop). The machine speeds are controllable. The objective function takes the form \(C_ 0t^{q_ 1}_{\max}+C_ 1(s')^{q_ 2}+C_ 2(t')^{q_ 2}\), where \(C_ 0\), \(C_ 1\), \(C_ 2\), \(q_ 1\), \(q_ 2\) are constant, \(t_{\max}\) is the makespan of the schedule, s' and t' are the speeds of the two machines. An \(0(n^ 2 \log n)\) algorithm is presented to solve this problem assuming that power and root of the functions encountered in the algorithm can be calculated in constant time.
      0 references
      uniform machines
      0 references
      controllable speed
      0 references
      two machine scheduling
      0 references
      optimal machine speed pair
      0 references
      optimal schedule
      0 references
      mixed shop scheduling
      0 references

      Identifiers