EBQ for a multistage production system considering rework (Q1107427)

From MaRDI portal
Revision as of 12:25, 13 July 2023 by Importer (talk | contribs) (‎Created a new Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
EBQ for a multistage production system considering rework
scientific article

    Statements

    EBQ for a multistage production system considering rework (English)
    0 references
    0 references
    1988
    0 references
    Models have been developed to determine (a) the optimum number of cycles for rework and (b) the optimum batch quantity in a multistage production system in which rework is done at the same stage of production where it occurs. Two different policies of processing reworked lots are examined and a comparison is made considering the effect of change of each of the model parameters. Interpretations of the findings together with the resultant guidelines are also provided.
    0 references
    optimum number of cycles for rework
    0 references
    optimum batch quantity
    0 references
    multistage production system
    0 references

    Identifiers