Optimization of hydropower systems operation with a quadratic model (Q1109670)

From MaRDI portal
Revision as of 13:08, 13 July 2023 by Importer (talk | contribs) (‎Created a new Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
Optimization of hydropower systems operation with a quadratic model
scientific article

    Statements

    Optimization of hydropower systems operation with a quadratic model (English)
    0 references
    0 references
    0 references
    0 references
    1988
    0 references
    The paper treats the problem of optimal hydropower generation in a reservoir network. A deterministic discrete-time optimal control problem is formulated with a quadratic performance index and linear equality and inequality constraints both on the state and the control variables. The optimization problem is solved by use of a particular successive approximation algorithm of the feasible direction type. The algorithm is presented in full detail and is applied to a practical example involving six reservoirs over a time horizon of 12 time intervals corresponding to one year. Results indicate sufficient accuracy and low computational requirements of the presented method.
    0 references
    0 references
    optimal hydropower generation
    0 references
    reservoir network
    0 references
    deterministic discrete- time optimal control
    0 references
    quadratic performance index
    0 references
    linear equality and inequality constraints
    0 references
    successive approximation
    0 references
    feasible direction
    0 references

    Identifiers