A note on the single machine serial batching scheduling problem to minimize maximum lateness with identical processing times

From MaRDI portal
Revision as of 12:51, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1876151

DOI10.1016/S0377-2217(03)00361-8zbMath1067.90051MaRDI QIDQ1876151

Jinjiang Yuan, Aifeng Yang, Cheng, T. C. Edwin

Publication date: 16 August 2004

Published in: European Journal of Operational Research (Search for Journal in Brave)






Cites Work


Related Items (8)





This page was built for publication: A note on the single machine serial batching scheduling problem to minimize maximum lateness with identical processing times