The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics

From MaRDI portal
Revision as of 16:33, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1936599

DOI10.1007/s00291-011-0265-0zbMath1260.90098OpenAlexW1972351035MaRDI QIDQ1936599

Armin Scholl, Malte Fliedner, Nils Boysen

Publication date: 6 February 2013

Published in: OR Spectrum (Search for Journal in Brave)

Full work available at URL: https://www.db-thueringen.de/servlets/MCRFileNodeServlet/dbt_derivate_00021001/2009-11.pdf




Related Items (16)

New formulations for the setup assembly line balancing and scheduling problemAssembly line balancing: what happened in the last fifteen years?The type E simple assembly line balancing problem: a mixed integer linear programming formulationSolving the Type-2 Assembly Line Balancing with Setups Using Logic-Based Benders DecompositionA novel constraint programming and simulated annealing for disassembly line balancing problem with and/or precedence and sequence dependent setup timesSequence-dependent time- and cost-oriented assembly line balancing problems: a combinatorial Benders’ decomposition approachRobust counterpart mathematical models for balancing, sequencing, and assignment of robotic U-shaped assembly lines with considering failures and setup timesBalancing a robotic spot welding manufacturing line: an industrial case studyMathematical model and a variable neighborhood search algorithm for mixed-model robotic two-sided assembly line balancing problems with sequence-dependent setup timesScheduling with time-dependent discrepancy timesScheduling jobs with a V-shaped time-dependent processing timeBalancing and scheduling of flexible mixed model assembly linesSALSA: combining branch-and-bound with dynamic programming to smoothen workloads in simple assembly line balancingCombinatorial Benders cuts for assembly line balancing problems with setupsEnhanced multi-hoffmann heuristic for efficiently solving real-world assembly line balancing problems in automotive industryMetaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times



Cites Work


This page was built for publication: The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics