Assembly line balancing: what happened in the last fifteen years?
DOI10.1016/J.EJOR.2021.11.043zbMATH Open1506.90087OpenAlexW3215942922MaRDI QIDQ2140264FDOQ2140264
Armin Scholl, Nils Boysen, Philipp Schulze
Publication date: 20 May 2022
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2021.11.043
Recommendations
- A survey on problems and methods in generalized assembly line balancing
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
- A classification of assembly line balancing problems
- A survey of the parallel assembly lines balancing problem
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
Deterministic scheduling theory in operations research (90B35) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02) Production models (90B30)
Cites Work
- A survey of the parallel assembly lines balancing problem
- Enhanced branch-bound-remember and iterative beam search algorithms for type II assembly line balancing problem
- Beam-ACO for simple assembly line balancing
- \texttt{Absalom}: balancing assembly lines with assignment restrictions
- Optimally solving the alternative subgraphs assembly line balancing problem
- A classification of assembly line balancing problems
- Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
- A survey on problems and methods in generalized assembly line balancing
- Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing
- An improved mathematical program to solve the simple assembly line balancing problem
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
- Eureka: A Hybrid System for Assembly Line Balancing
- SALOME: A Bidirectional Branch-and-Bound Procedure for Assembly Line Balancing
- On a learning precedence graph concept for the automotive industry
- The sequence-dependent assembly line balancing problem
- Part logistics in the automotive industry: decision problems, literature review and research agenda
- Matheuristics
- Mixed Model Line Balancing with Smoothed Station Assignments
- Production-Line Balances for Mixed-Model Lines
- Balancing assembly lines with variable parallel workplaces: problem definition and effective solution procedure
- Maximizing the production rate in simple assembly line balancing -- A branch and bound procedure
- The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics
- Balancing of simple assembly lines under variations of task processing times
- Balancing stochastic two-sided assembly lines: a chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
- Heuristics and lower bounds for the simple assembly line balancing problem type 1: overview, computational tests and improvements
- New formulations for the setup assembly line balancing and scheduling problem
- A branch, bound, and remember algorithm for the simple assembly line balancing problem
- Assembly-Line Balancing by Linear Programming
- The type E simple assembly line balancing problem: a mixed integer linear programming formulation
- Balancing of parallel U-shaped assembly lines
- A chance-constrained approach to stochastic line balancing problem
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Greedy randomized adaptive search procedures
- Principles on the Benefits of Manufacturing Process Flexibility
- Ant algorithms for a time and space constrained assembly line balancing problem
- An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
- A decomposition based solution algorithm for U-type assembly line balancing with interval data
- ASALBP: the alternative subgraphs assembly line balancing problem
- Metaheuristics—the metaphor exposed
- Enhanced multi-hoffmann heuristic for efficiently solving real-world assembly line balancing problems in automotive industry
- An enumeration procedure for the assembly line balancing problem based on branching by non-decreasing idle time
- An application of the branch, bound, and remember algorithm to a new simple assembly line balancing dataset
- Balancing assembly lines with tabu search
- Designing energy-efficient serial production lines: the unpaced synchronous line-balancing problem
- Hybrid metaheuristics for the accessibility windows assembly line balancing problem level 2 (AWALBP-L2)
- Models for assembly line balancing by temporal, spatial and ergonomic risk attributes
- Combining matheuristics and MILP to solve the accessibility windows assembly line balancing problem level 2 (AWALBP-L2)
- An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations
- A competitive branch-and-bound algorithm for the simple assembly line balancing problem
- Moving policies in cyclic assembly line scheduling
- A dynamic programming based heuristic for the assembly line balancing problem
- Solving the accessibility windows assembly line problem level 1 and variant 1 (AWALBP-L1-1) with precedence constraints
- A new MILP model for the accessibility windows assembly line balancing problem level 2 (AWALBP-L2)
- Branch and bound procedures for solving the assembly line worker assignment and balancing problem: Application to sheltered work centres for disabled
- Assembly line balancing and group working: a heuristic procedure for workers' groups operating on the same product and workstation
- Note. Optimal balancing of U-shaped assembly lines
- Balancing two-sided assembly lines with sequence-dependent setup times
- Balancing parallel two-sided assembly lines
- A meta-heuristic algorithm for the fuzzy assembly line balancing type-E problem
- Model and heuristics for the assembly line worker integration and balancing problem
- Heuristics and simulated annealing procedures for the accessibility windows assembly line problem level 1 (AWALBP-L1)
- Multi-objective balancing of assembly lines by population heuristics
- An empirical investigation of the two-moment approximation for production lines
- The U-line Line Balancing Problem
- Bi-criteria assembly line balancing by considering flexible operation times
- On solving the assembly line worker assignment and balancing problem via beam search
- On the MILP model for the U-shaped assembly line balancing problems
- A mathematical model and a genetic algorithm for two-sided assembly line balancing
- Using the Taguchi method to optimize the differential evolution algorithm parameters for minimizing the workload smoothness index in simple assembly line balancing
- Balancing mixed-model assembly lines: a computational evaluation of objectives to smoothen workload
- Variable neighborhood search for the second type of two-sided assembly line balancing problem
- U-shaped assembly line balancing problem with genetic algorithm
- Balancing and sequencing mixed-model just-in-time \(U\)-lines with multiple objectives
- A Branch and Bound Algorithm for Assembly Line Balancing Problems with Formulation Irregularities
- Constraint programming model for multi-manned assembly line balancing problem
- Balancing two-sided U-type assembly lines using modified particle swarm optimization algorithm
- Assembly-Line Balancing—Dynamic Programming with Precedence Constraints
- Cyclic scheduling to minimize inventory in a batch flow line
- A versatile algorithm for assembly line balancing
- Combinatorial Benders cuts for assembly line balancing problems with setups
- Workload smoothing in simple assembly line balancing
- A memetic algorithm for the cost-oriented robotic assembly line balancing problem
- Exact and heuristic methods for solving the robotic assembly line balancing problem
- Ergonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem: a multi-objective approach
- A novel two-stage framework for reducing ergonomic risks of a mixed-model parallel U-shaped assembly-line
- An Integer Programming Procedure for Assembly System Design Problems
- Balancing stochastic parallel assembly lines
- Corrigendum to ``Balancing and scheduling tasks in assembly lines with sequence-dependent setup [European Journal of Operational Research 187 (2008) 1212-1223]
- On the complexity of assembly line balancing problems
- Branch, bound and remember algorithm for two-sided assembly line balancing problem
- Improved integer programming models for simple assembly line balancing and related problems
- Comprehensive review and evaluation of heuristics and meta-heuristics for two-sided assembly line balancing problem
- Balancing stochastic two-sided assembly line with multiple constraints using hybrid teaching-learning-based optimization algorithm
- The multi-objective assembly line worker integration and balancing problem of type-2
- The robust (minmax regret) assembly line worker assignment and balancing problem
- Traveling worker assembly line (re)balancing problem: model, reduction techniques, and real case studies
- Balancing a robotic spot welding manufacturing line: an industrial case study
- Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times
- A Benders' decomposition algorithm with combinatorial cuts for the multi-manned assembly line balancing problem
- SALSA: combining branch-and-bound with dynamic programming to smoothen workloads in simple assembly line balancing
- A fast and effective heuristic for smoothing workloads on assembly lines: algorithm design and experimental analysis
Cited In (18)
- A new upper bound based on Dantzig-Wolfe decomposition to maximize the stability radius of a simple assembly line under uncertainty
- Model and metaheuristic for human-robot collaboration assembly line worker assignment and balancing problem
- A branch, bound and remember algorithm for maximizing the production rate in the simple assembly line balancing problem
- Heuristic and metaheuristic procedures for the parallel assembly lines balancing problem with multi-line workstations and buffer sizing
- Mixed-model moving assembly line material placement optimization for a shorter time-dependent worker walking time
- Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective
- R-SALSA: a branch, bound, and remember algorithm for the workload smoothing problem on simple assembly lines
- Evaluation of stochastic flow lines with provisioning of auxiliary material
- A classification of assembly line balancing problems
- A survey on problems and methods in generalized assembly line balancing
- Analysis of the simple assembly line balancing problem complexity
- The mechanisms of labor division from the perspective of task urgency and game theory
- Balancing U-type assembly lines with human-robot collaboration
- In-line kitting for part feeding of assembly lines: workload balancing and storage assignment to reduce the workers' walking effort
- Heuristic and metaheuristic procedures for the buffer sizing problem in parallel assembly lines balancing problem with multi-line workstations and different cycle times
- Exact and heuristic methods for a workload allocation problem with chain precedence constraints
- Chance-constrained stochastic assembly line balancing with branch, bound and remember algorithm
- An exact constraint programming based procedure for the multi-manned assembly line balancing problem
Uses Software
This page was built for publication: Assembly line balancing: what happened in the last fifteen years?
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2140264)