Ergonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem: a multi-objective approach
From MaRDI portal
Publication:2185520
DOI10.1016/j.cor.2020.104905zbMath1458.90241OpenAlexW3005035710MaRDI QIDQ2185520
Zikai Zhang, Rubén Ruiz, Qiuhua Tang, Li-Ping Zhang
Publication date: 4 June 2020
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2020.104905
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items (4)
A novel two-stage framework for reducing ergonomic risks of a mixed-model parallel U-shaped assembly-line ⋮ Assembly line balancing: what happened in the last fifteen years? ⋮ Balancing U-type assembly lines with human-robot collaboration ⋮ Bi-objective parallel machine scheduling with additional resources during setups
Cites Work
- Models for assembly line balancing by temporal, spatial and ergonomic risk attributes
- A heuristic and a branch-and-bound algorithm for the assembly line worker assignment and balancing problem
- Model and heuristics for the assembly line worker integration and balancing problem
- A decomposition based solution algorithm for U-type assembly line balancing with interval data
- An iterative genetic algorithm for the assembly line worker assignment and balancing problem of type-II
- On solving the assembly line worker assignment and balancing problem via beam search
- A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
- Iterated greedy algorithms for the blocking flowshop scheduling problem with makespan criterion
- Two-sided assembly line balancing problem of type I: improvements, a simple algorithm and a comprehensive study
- The robust (minmax regret) assembly line worker assignment and balancing problem
- A branch-and-bound algorithm for assembly line worker assignment and balancing problems
- Rules-based heuristic approach for the U-shaped assembly line balancing problem
- Branch and bound procedures for solving the assembly line worker assignment and balancing problem: Application to sheltered work centres for disabled
- Hybrid population-based algorithms for the bi-objective quadratic assignment problem
- The U-line Line Balancing Problem
This page was built for publication: Ergonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem: a multi-objective approach