A line balancing problem with parallel workers and cycle time minimization
From MaRDI portal
Cites work
- A branch-and-bound algorithm for assembly line worker assignment and balancing problems
- A classification of assembly line balancing problems
- A parallel station heuristic for the mixed-model production line balancing problem
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
- A survey on problems and methods in generalized assembly line balancing
- A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
- An Algorithm for the Line Balancing Problem
- An exact constraint programming based procedure for the multi-manned assembly line balancing problem
- ANTBAL: an ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations
- Assembly line balancing and group working: a heuristic procedure for workers' groups operating on the same product and workstation
- Assembly line balancing: what happened in the last fifteen years?
- Developing optimization \& robust models for a mixed-model assembly line balancing problem with semi-automated operations
- Formulation of a problem involving assembly lines with multiple manning of work stations
- Multi-manned assembly line balancing problem with dependent task times: a heuristic based on solving a partition problem with constraints
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
- Using distributed search methods for balancing mixed-model assembly lines in the automotive industry
- Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
This page was built for publication: A line balancing problem with parallel workers and cycle time minimization
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6974194)