Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods
Publication:1979194
DOI10.1007/s11750-020-00589-4zbMath1476.90277arXiv1903.08609OpenAlexW3120475491MaRDI QIDQ1979194
Kennedy A. G. Araújo, Bruno A. Prata, Anselmo R. Pitombeira-Neto, Tibérius O. Bonates
Publication date: 2 September 2021
Published in: Top (Search for Journal in Brave)
Full work available at URL: https://arxiv.org/abs/1903.08609
integer linear programmingprestressed concreteprecast beamsmodular constructionsize reduction heuristics
Applications of statistics in engineering and industry; control charts (62P30) Mixed integer programming (90C11) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Combinatorial optimization (90C27)
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Heuristics for sequencing cutting patterns
- The combined cutting stock and lot-sizing problem in industrial processes
- The one-dimensional cutting stock problem with due dates
- Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources
- Heuristics for the integer one-dimensional cutting stock problem: A computational study
- A combined cutting-stock and lot-sizing problem
- A matheuristic algorithm for the one-dimensional cutting stock and scheduling problem with heterogeneous orders
- MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints
- Solving a combined cutting-stock and lot-sizing problem with a column generating procedure
- An integrated cutting stock and sequencing problem
- AN OPTIMIZATION MODEL FOR PRECAST PROJECT PLANNING USING GROUP CONCEPTS
- Multi-job Cutting Stock Problem with Due Dates and Release Dates
This page was built for publication: Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods