Just‐in‐time scheduling problem with due windows and release dates for precast bridge girders
From MaRDI portal
Publication:6195034
DOI10.1111/itor.13431OpenAlexW4391144352WikidataQ129417109 ScholiaQ129417109MaRDI QIDQ6195034
No author found.
Publication date: 12 March 2024
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/itor.13431
Cites Work
- Unnamed Item
- Unnamed Item
- A branch-and-bound algorithm for single machine scheduling with quadratic earliness and tardiness penalties
- A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem
- Single-machine scheduling with time windows and earliness/tardiness penalties
- Single machine earliness and tardiness scheduling
- A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem
- Algorithms for job scheduling problems with distinct time windows and general earliness/tardiness penalties
- An exact approach to early/tardy scheduling with release dates
- Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties
- Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods
- Branch-and-bound algorithms for minimizing total earliness and tardiness in a two-machine permutation flow shop with unforced idle allowed
- A branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penalties
- The one-machine problem with earliness and tardiness penalties
- Just-in-time scheduling for a distributed concrete precast flow shop system
- New Exact Algorithms for One-Machine Earliness-Tardiness Scheduling
- Minimizing Total Tardiness on One Machine is NP-Hard
- Sequencing with Earliness and Tardiness Penalties: A Review
- The Single Machine Early/Tardy Problem
- Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date
- Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date
- Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties
- A Branch-and-Bound Algorithm for Single-Machine Earliness–Tardiness Scheduling with Idle Time
- A heuristic algorithm to minimize total weighted tardiness on a single machine with release times
- The integrated cutting and packing heterogeneous precast beams multiperiod production planning problem
- Matheuristics: survey and synthesis
- Initialization of metaheuristics: comprehensive review, critical analysis, and research directions
- Enhanced lower bounds and exact procedures for total completion time minimization in a two‐machine permutation flowshop with release dates
- Algorithms for a two‐machine flowshop problem with jobs of two classes