Single machine scheduling problem with interval processing times and total completion time objective
From MaRDI portal
Publication:2283853
DOI10.3390/a11050066zbMath1461.90057MaRDI QIDQ2283853
Natalja G. Egorova, Yuri N. Sotskov
Publication date: 13 January 2020
Published in: Algorithms (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3390/a11050066
90B35: Deterministic scheduling theory in operations research
Related Items
Optimality region for job permutation in single-machine scheduling with uncertain processing times, Editorial. Special issue on algorithms for scheduling problems
Cites Work
- Unnamed Item
- Single machine scheduling problem with interval processing times to minimize mean weighted completion time
- The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective
- On the robust single machine scheduling problem
- Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date
- A 2-approximation algorithm for interval data minmax regret sequencing problems with the total flow time criterion
- Minimizing total weighted flow time of a set of jobs with interval processing times
- Optimal fuzzy counterparts of scheduling rules
- Robust discrete optimization and its applications
- Minimizing total weighted flow time under uncertainty using dominance and a stability box
- Robust scheduling on a single machine to minimize total flow time
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Dispatching rules in scheduling Dispatching rules in scheduling: a fuzzy approach
- Stability of Johnson's schedule with respect to limited machine availability
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production