Using compressed workweeks to save labour cost
From MaRDI portal
Publication:2572842
DOI10.1016/j.ejor.2004.09.043zbMath1079.90570OpenAlexW2031411498MaRDI QIDQ2572842
Publication date: 4 November 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2004.09.043
Resource and cost allocation (including fair division, apportionment, etc.) (91B32) Marketing, advertising (90B60)
Related Items (2)
An integer programming model for hierarchical workforce scheduling problem ⋮ A resource type analysis of the integrated project scheduling and personnel staffing problem
Cites Work
- Single-shift off-day scheduling of a hierarchical workforce with variable demands
- Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements
- Scheduling of Work Forces Required in Continuous Operations Under Alternative Labor Policies
- Workforce Scheduling with Cyclic Demands and Day-Off Constraints
- Optimal Scheduiing of Two Consecutive Idle Periods
This page was built for publication: Using compressed workweeks to save labour cost